Fire-Rated Facade Systems
FR ACP zones, cavity barriers and material control for high-rise fire strategies.
Fire-Rated Facade Systems
High-rise fire strategies increasingly control combustible cladding, cavity barriers and compartmentation at the facade. Mixing PE offcuts into FR elevations is a common site failure mode.
We install FR-grade ACP systems and coordinate cavity detailing with the project's fire consultant - we do not replace statutory fire engineering.
What the client needs
A complete pack produces a buildable estimate and fewer site claims. Share what you have via contact - we will list gaps plainly.
- Fire strategy extracts
- FR brand and core grade list
- Cavity barrier details
- Zone drawings (FR vs non-FR)
- Inspection and documentation requirements
Capabilities
- FR ACP installation
- Material control on site
- Cavity barrier coordination
- Documentation for approvals
- Training toolbox talks on FR zones
Types & variants
Choose the variant that matches performance, aesthetics and logistics - not brochure habit.
High-rise compliance zones.
Specific floors / faces.
Stricter occupancy rules.
With survey of existing build-up.
Materials we work with
Final brands follow the approved specification and fire strategy.
Brand-locked.
As fire consultant details.
Where required.
How we deliver
- Survey & pack review - drawings, access and interfaces.
- Shop drawings / coordination - freeze details with your consultant.
- Mock-up where required - visual and performance checks.
- Fabrication & procurement - brackets, panels, glass as scoped.
- Install & QA - monsoon-aware sequencing and documented sign-off.
- Handover - as-builts, batches and maintenance notes.
Why choose Shebi?
20+ years on site
FR ACP install with material discipline and documentation.
Developer-grade QA
Mock-ups, documented sign-off and clear exclusions.
Monsoon-ready details
Weep paths, flashings and sealant specs matched to exposure.
Related projects
FAQ
Fire engineering remains with the appointed consultant; we install and document to approved details.
Only as the strategy allows - never by accident on site.
Batch records and photos support approvals.
Possible with survey and strategy update.
FR cores and detailing cost more - budget explicitly.
Related reading
Guides from Shebi Enterprises to help you specify and tender this package.