Fire-Rated Facade Systems

FR ACP zones, cavity barriers and material control for high-rise fire strategies.

Fire-Rated Facade Systems - Shebi Enterprises
What is it?

Fire-Rated Facade Systems

High-rise fire strategies increasingly control combustible cladding, cavity barriers and compartmentation at the facade. Mixing PE offcuts into FR elevations is a common site failure mode.

We install FR-grade ACP systems and coordinate cavity detailing with the project's fire consultant - we do not replace statutory fire engineering.

What the client needs

A complete pack produces a buildable estimate and fewer site claims. Share what you have via contact - we will list gaps plainly.

  • Fire strategy extracts
  • FR brand and core grade list
  • Cavity barrier details
  • Zone drawings (FR vs non-FR)
  • Inspection and documentation requirements
Fire-Rated Facade Systems detail - Shebi Enterprises

Capabilities

  • FR ACP installation
  • Material control on site
  • Cavity barrier coordination
  • Documentation for approvals
  • Training toolbox talks on FR zones

Types & variants

Choose the variant that matches performance, aesthetics and logistics - not brochure habit.

Full FR elevations

High-rise compliance zones.

Partial FR bands

Specific floors / faces.

Hospitality / assembly

Stricter occupancy rules.

Retrofit FR upgrades

With survey of existing build-up.

Materials we work with

Final brands follow the approved specification and fire strategy.

FR mineral-core ACP
Brand-locked.
Cavity barriers
As fire consultant details.
Non-combustible trims
Where required.
Fire-Rated Facade Systems installation - Shebi Enterprises

How we deliver

  1. Survey & pack review - drawings, access and interfaces.
  2. Shop drawings / coordination - freeze details with your consultant.
  3. Mock-up where required - visual and performance checks.
  4. Fabrication & procurement - brackets, panels, glass as scoped.
  5. Install & QA - monsoon-aware sequencing and documented sign-off.
  6. Handover - as-builts, batches and maintenance notes.

Why choose Shebi?

20+ years on site

FR ACP install with material discipline and documentation.

Developer-grade QA

Mock-ups, documented sign-off and clear exclusions.

Monsoon-ready details

Weep paths, flashings and sealant specs matched to exposure.

FAQ

Fire engineering remains with the appointed consultant; we install and document to approved details.

Only as the strategy allows - never by accident on site.

Batch records and photos support approvals.

Possible with survey and strategy update.

FR cores and detailing cost more - budget explicitly.

Keep FR zones real on site, not only on drawings

Share fire strategy extracts for an FR install discussion.

Guides from Shebi Enterprises to help you specify and tender this package.

Related services

Browse all insights Get free quote

Get Free Quote