Unitised Curtain Wall
Factory-sealed unitised modules for repetitive towers with Mumbai logistics planning.
Unitised Curtain Wall
Unitised curtain wall improves quality control by sealing modules in the factory and hanging them on site. Crane windows, trailer access and staging yards decide whether oversized modules are realistic in dense Mumbai plots.
We coordinate fabrication partners, glass procurement and site hang sequences with clear interface ownership.
What the client needs
A complete pack produces a buildable estimate and fewer site claims. Share what you have via contact - we will list gaps plainly.
- Module grid and elevations
- Factory slot and glass lead times
- Crane / trailer access study
- Anchor and embed survey
- Stick vs unitised podium decision
Capabilities
- Unitised hang programmes
- Hybrid stick podium + unitised tower
- Logistics planning
- Interface detailing
- Site QA on hang days
Types & variants
Choose the variant that matches performance, aesthetics and logistics - not brochure habit.
Repetitive grids.
Stick podium + unitised typical floors.
Tight urban logistics.
Early engineering engagement.
Materials we work with
Final brands follow the approved specification and fire strategy.
System brands as specified.
Locked early.
Surveyed.
How we deliver
- Survey & pack review - drawings, access and interfaces.
- Shop drawings / coordination - freeze details with your consultant.
- Mock-up where required - visual and performance checks.
- Fabrication & procurement - brackets, panels, glass as scoped.
- Install & QA - monsoon-aware sequencing and documented sign-off.
- Handover - as-builts, batches and maintenance notes.
Why choose Shebi?
20+ years on site
Unitised delivery with Mumbai crane and staging realism.
Developer-grade QA
Mock-ups, documented sign-off and clear exclusions.
Monsoon-ready details
Weep paths, flashings and sealant specs matched to exposure.
Related projects
FAQ
They reduce site silicone dependency for primary lines - interfaces still matter.
Factory slots plus glass often need months.
Yes - common on podium vs tower.
Often required in dense plots.
State clearly in tender.